This commercial project involving STAAR surgery was unique in several aspects. First, we installed 720 kW of solar panels on the roof and between two parking structures located at the north and south ends of the property. Next, we set up a Battery Energy Storage System (BESS) alongside an existing 500 kW diesel generator.
Having strong support and clear communication with individuals like Thomas from Greentech Renewables helped us navigate the various challenges associated with large-scale development. Collaborating with a reliable partner like Greentech Renewables allowed us, as developers, to concentrate on the construction and integration of the system rather than having to procure the necessary materials and components independently.
Orange County, CA 90633
United States